
Asbestos surveys
Arranged before work starts, so asbestos is in the programme and the price rather than found halfway through.
Service 03
Asbestos is planned for, not discovered halfway through a job. Where a building may contain it, an asbestos survey is part of our package before demolition starts, as it was at The Cranleigh in Hornchurch.
Where asbestos materials are found we remove them safely, as with the asbestos cement roof of a garden shed at Bodiam Close in Enfield, and carry the waste away under our own upper tier waste carrier registration, with the paperwork to show it was disposed of properly.
The work
Where a building may contain asbestos, the survey comes before the programme, so any removal is priced and sequenced from the start. Materials are removed, wrapped and carried away safely, and the waste leaves with the paperwork to show where it went.
What we do

Arranged before work starts, so asbestos is in the programme and the price rather than found halfway through.

Lower-risk asbestos materials, such as cement roof sheets, taken down, wrapped and removed safely.

Carried away by our own registered waste carrier and disposed of properly, with the paperwork to prove it.
Goes well with

Asbestos roof removal, demolition and clearance of a fire-damaged garage in Tilbury, with the concrete slab retained and the site secured.
2 half days Programme
Case studies

Where we work
Based in Aveley, Essex, and set up to work right across the UK. Wherever your site is, we can get to it. Every case study we publish adds a pin here.
Select an orange pin or group to read a case study. Grey pins and groups are jobs without a write-up yet.
Whether it's a full site or a single house, tell us what you're looking at and we'll come back with straight answers: a plan, a price and a programme. No obligation, no hard sell.