Contact us
Now hiring across London and the South EastView vacancies

Cavendish Square, Mayfair

Developers

Soft strip, demolition, temporary works, structural alterations, drainage, metal decking and groundworks in Mayfair.

Soft strip, demolition, temporary works, structural alterations, drainage, metal decking, groundworks at property in Mayfair

REB Group was appointed to undertake a comprehensive package of enabling, demolition and structural works at Cavendish Square in Mayfair, working as part of the wider refurbishment programme for the property.

The project involved a broad range of works, from the initial soft strip and demolition through to temporary works, structural alterations, drainage, groundworks and the installation of metal decking. The varied scope required close coordination between our site team, the main contractor and the wider project team to ensure each phase was delivered safely, efficiently and in line with the construction programme.

Our Works

REB Group's scope included:

  • Soft strip and internal demolition
  • Temporary works and associated structural support
  • Structural alterations and opening works
  • Groundworks
  • Drainage installations
  • Metal decking
  • General enabling works associated with the structural refurbishment

The project was planned around approximately 390 man-days, with the initial phase allowing four weeks for the preparation and implementation of the required RAMS and site-file documentation.

Project Delivery

Given the nature of the works, early coordination and planning were key to the successful delivery of the project. Particular attention was given to the temporary works strategy, the extent of plaster removal and the proposed structural opening works before construction commenced.

REB Group worked closely with Westgreen Construction to establish the required sequence of works and coordinate the information needed to progress the project efficiently. This included reviewing quotation notes and previous correspondence, confirming temporary works requirements and coordinating the full construction programme.

Our approach was centred around maintaining a safe and controlled working environment while progressing the demolition and structural elements efficiently and preparing each area for the subsequent stages of the refurbishment.

REB Group's Approach

The combination of demolition, temporary works and structural alterations required a methodical approach, with careful consideration given to the existing building and the sequencing of works.

Our experienced site and management teams coordinated the different elements of the package to minimise delays and ensure the works progressed in a controlled manner. By bringing demolition, temporary works, structural alterations, drainage, groundworks and metal decking together within a single package, REB Group was able to provide a coordinated delivery solution for the project.

Project Outcome

The 16-week programme represents a significant package of enabling and structural works within a prime Mayfair location. REB Group's involvement provided the essential structural and enabling infrastructure required to allow the wider refurbishment works at Cavendish Square to progress.

The project demonstrates REB Group's ability to deliver complex refurbishment and structural packages within challenging London environments, combining technical expertise, careful planning and reliable site delivery.

Project team

  • Main Contractor: Westgreen
  • Client: Commercial Developer

On site

Tell us about the job

Whether it's a full site or a single house, tell us what you're looking at and we'll come back with straight answers: a plan, a price and a programme. No obligation, no hard sell.